WeWorks

199 Bishopsgate

A fast track, design and build Cat B fit Out to 90,000 Sqft arranged over 4 floors from Cat A. The end user, We Works, wanted flexible highly cellularised floors that can be easily adapted for either short or long term tenants of varying sizes. Works included the provision of the fit out to offices and various break out spaces and stand alone entrance and reception.

Electrical systems comprised of:

  • Exposed high level services
  • Hardwired Under floor and desk power
  • Mechanical power
  • Lighting Installation and modification
  • Modification of the Lighting Control
  • Modification of Fire Detection and Alarm
  • SER Rooms
  • Toilet Fit-Out